Solina Golf Club
Location
West Columbia, South Carolina
Project Type
New Construction – Commercial
Scope of Work
Replacement of existing failing culverts with 12’x75’ bridge to cross Hunts Pond and access other half of golf course
6000 sqft maintenance building.
1800 sqft deck for restaurant, and incidental ADA ramps.
Foundation certification of existing foundation slab for the replacement of delipidated Pro Shop.
Vaulted ceiling design in new Pro Shop
Incidental repair documents for damages uncovered during construction (e.g. truss)
Key Challenges
The drainage area for Hunts Pond and the bridge is 37 sq miles. The floodplain which this causeway spans across is approximately 400’ wide. Balancing bridge length with having enough freeboard beneath the bridge for common storm events and a causeway designed to be overtopped during extreme storm events.
Facilitating construction with materials selections due to accessibility constraints.
Incorporating and staging the main irrigation line to the entire golf course.
Project Team
Owner: Solina Golf Club
Contractor (Bridge): Pyramid Contracting
Contractor (Buildings): Hillman Design Build